From October 2018, as I was taking a train to Albany, the demolition of the old Tappan Zee Bridge, with the new bridge behind it:

That’s a big floating crane because disassembling cantilever trusses needs both careful sequencing and the ability carry off big pieces. The truss portion of the old bridge is, of course, over the shipping channel, so more care than usual was needed.

You must be logged in to post a comment.